Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Solenne / Our approach

Clarity at every stage.

A clear brief, considered decisions and defined responsibilities. Here is how a project takes shape.

01

Begin with a conversation

Share the property, your priorities and the way you want the space to work. We identify the right specialist scope and the information needed for the next step.

  • Your priorities and intended use
  • Property details and current photographs
02

Understand the place

Review dimensions, existing conditions, services and access. Where required, a site survey and specialist review establish what can be taken forward.

  • Measured information and existing condition
  • Access and specialist review requirements
03

Define every detail

Agree the design, material selections, responsibilities and itemised proposal. The programme records the decisions and dependencies before work begins.

  • Agreed scope, selections and programme
  • Named responsibilities and change process
04

Coordinate the work

Your agreed project contact coordinates the work packages, updates and changes. Important concealed stages and finish details are reviewed before progressing.

  • Progress updates and decision records
  • Work-stage and finish reviews
05

Bring it all together

Inspect the agreed scope, record and close out snags, then provide the specified operating information, care guidance and warranty responsibilities.

  • Snagging and agreed completion checks
  • Care, operation and warranty information
WHAT THE STAGES SHOULD PRODUCE

A process you can review.

01

Brief

A written record of the priorities, retained elements and questions that need investigation.

02

Design

Current layouts and the specification information needed to review the proposed solution.

03

Commitment

An agreed scope, named responsibilities and a record of decisions required before purchase.

04

Delivery

Coordinated instructions, progress updates and the agreed reviews for the work in scope.

05

Handover

A snag record and the specified operating, care and product information.

01

Plan shade around use

Record when and where you want to sit, cook or move through the garden. Shade design should respond to those actual patterns and the site's exposure, with structure and approvals reviewed for the project. Place the intended furniture into the measured plan and review it in use, including chairs pulled away from a table. Consider the view and light inside adjoining rooms. The preferred option should balance those relationships with the relevant technical requirements, giving the household a clear reason for the selected position and structure.

02

Coordinate surfaces and water

Terrace levels, door thresholds, drainage and planting edges belong in the same drawing. Surface selection should account for heat, wet conditions and the intended maintenance routine. Ask the appointed team to review the supporting construction and the junctions between products, not only the visible sample. Identify how the area is cleaned and how damaged components could be addressed. Keep current manufacturer information connected to the selected finish so the care discussion reflects the actual material and exposure.

03

Design the evening scene

Use lighting to support paths, steps, dining and selected planting without making every surface equally bright. Coordinate fittings, cables, controls and maintenance access with the landscape plan. Describe a few useful evening settings in plain language and review them from the house as well as the garden. Keep the technical design with the appointed professionals. Include operation, access and product references in the handover so the intended atmosphere remains understandable to the people using and maintaining the space.

BEYOND THE FINISHED PHOTOGRAPH

A useful record for what comes next.

Our perspective is to make outdoor space feel intentional in use. A connected plan brings together the visible atmosphere and the less visible details of maintenance, service access and construction sequence.

Agree the handover package as part of the appointment. Identify the documents required, the party providing each one and the arrangements for reporting incomplete work or later concerns.

Explore planning and aftercare guides

Your Solenne handover discussion

  • Landscape and external-services information
  • Surface and structure specifications
  • Lighting and equipment schedules
  • Drainage and service-access information
  • Care plan for furniture and finishes
  • Snagging and responsible-party contacts
YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your outdoor living brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry