Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Solenne / SPECIALIST SERVICES

Outdoor kitchens in Dubai

Cook, gather and stay outside longer.

Plan equipment, preparation, serving and storage together. Review site conditions, service routes and maintenance access before specifying the counter and appliances.

Discuss this service
Outdoor kitchens in Dubai — design concept
Specialist design concept
THE SCOPE

Define it clearly.
Deliver it thoughtfully.

Plan equipment, preparation, serving and storage together. Review site conditions, service routes and maintenance access before specifying the counter and appliances. Your proposal identifies the agreed work packages, material choices and responsibilities for your specific property.

01

Cooking and entertaining brief

02

Equipment specification

03

Services and specialist installation

04

Material and storage selection

BEFORE DESIGN IS FINALISED

The right questions
at the right time.

Which appliances will you use?

Where do preparation and serving happen?

How will equipment be accessed for care?

We work through these decisions using the existing property information, site conditions and your priorities. Any specialist review or approval responsibility is identified in the project proposal.

BUDGET & PROGRAMME

Start with the scope.

A useful price follows measured quantities and an agreed specification. For outdoor kitchens, the scope and installation interfaces matter as much as the visible finish.

Read our cost guidance

What shapes the proposal

  • Plot levels, drainage and access
  • Shade structures and hardscape
  • Outdoor equipment and service routes
  • Pool, planting and lighting interfaces

The programme separates design, external reviews, procurement and site work. It also records the decisions needed from you before orders or installation can proceed.

CONNECTED EXPERTISE

Plan the adjoining details.

A CLOSER LOOK AT THE SCOPE

Specify for exposure and the way you entertain.

An outdoor kitchen should account for cooking habits, seating, food preparation and the route back to the house. Review equipment suitability, ventilation, utilities and safe operating clearances with the selected suppliers and specialists. The cabinetry, worktop and hardware must suit their exposure. Include cleaning, covers, waste storage and access to service connections in the brief.

Explore the concept library
Outdoor terrace concept with a timber pergola, dining table and integrated kitchen.
Original design concept

Four points to carry into the brief

  • Cooking and serving routine
  • Outdoor-rated equipment and finishes
  • Utility and ventilation coordination
  • Cleaning, covers and service access

From a decision to a clear appointment

Keep the agreed choices with the current drawings and specification. Identify who designs, supplies and installs each element, and how the work connects to neighbouring packages.

The proposal should also record any remaining investigations, product information and handover requirements. Resolve changes in writing so their effect on the scope and programme can be reviewed.

Review the project standards
PLANNING EXAMPLE

How the brief can develop

A family wants to cook outside regularly but still uses the indoor kitchen for preparation. Compare a focused cooking point with a fuller outdoor arrangement against that routine. Use actual equipment information and review serving, seating, storage and cleaning. Have the appropriate specialists assess the proposed installation. The useful scope is the one that supports the household's real activities while remaining practical to maintain.

A SCOPE YOU CAN REVIEW

What to resolve in the proposal

Request a confirmed equipment schedule and coordinated construction, surfaces and services information. Identify supplier, installer and commissioning responsibilities, with maintenance and replacement access included. Clarify owner-supplied items and the relevant technical reviews. Keep operating guidance and product-specific care information with the final equipment references at handover.

Discuss this service

Choose the footprint from the cooking and serving routine

List what is prepared indoors, what is cooked outside and where food is served. Compare a focused grill and worktop with a larger arrangement using the same routine. Include landing space, waste, hand-washing or other facilities only where they belong in the reviewed scope. A longer counter is not automatically more useful if it weakens circulation, shade or the relationship to the dining area.

Place the selected equipment from its current product information, then have the appropriate specialists assess utilities, ventilation, clearances and surrounding construction. Keep owner-supplied items clearly identified. If the final appliance is undecided, record the dimensional and service assumptions rather than presenting the cabinet or worktop opening as confirmed.

Plan for exposure, cleaning and replacement

Review where sun, wind, rain, irrigation and pool splash can reach the installation. Ask suppliers to confirm the suitability and care requirements of the actual equipment, cabinetry, hardware and surfaces for that exposure. Include covers, drainage, cleaning access and the route for removing an appliance without dismantling unrelated work.

At handover, keep final equipment references, operating demonstrations and care information together. Check doors, drawers, lighting and equipment access in the completed arrangement. Record which protective actions and routine maintenance are the owner's responsibility, and use the actual warranty documents rather than assuming an indoor product warranty applies outdoors.

CONNECTED SCOPE

These related services often meet this scope at shared drawings, finishes, services or handover points.

YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your outdoor living brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry