Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Solenne / About

A considered perspective. Solenne.

Solenne plans outdoor living as a natural extension of the home. Shade, planting, pools and entertaining spaces are considered together, with the site and daily routines leading the design.

Shaded villa terrace with dining, planting and outdoor seatingDESIGN CONCEPT
OUR POINT OF VIEW

Beautiful spaces.
Clear responsibilities.

Integrated gardens, pools, shade and outdoor entertaining. The first step is to understand the place and the brief, then identify the design, delivery and specialist work needed.

Your proposal names the contracting parties and the people responsible for the agreed work. Design, supply, installation and specialist reviews are defined so you know where each responsibility sits.

Solenne is a specialist brand within the Fitworks collection. When a brief extends beyond our focus, we can connect the relevant services as part of your overall project plan.

How we work

Thoughtful design

Begin with use, proportion and the existing place. Make each decision part of a coherent whole.

Specific proposals

Define what is included, what needs investigation and what must be decided before work begins.

Connected delivery

Coordinate the interfaces between specialists and record the information needed for a considered handover.

OUR POINT OF VIEW

Make the outdoor room useful throughout the day.

Solenne plans outdoor living as an extension of the home. A terrace may need to support breakfast, family time, cooking and evening entertaining, with different requirements for shade, circulation and light at each moment.

The practical design begins with the site: sun exposure, existing levels, drainage, access and the relationship to doors and neighbouring spaces. Planting, structures, services and furniture should be coordinated before individual features are purchased.

Our perspective is to make outdoor space feel intentional in use. A connected plan brings together the visible atmosphere and the less visible details of maintenance, service access and construction sequence.

01

Plan shade around use

Record when and where you want to sit, cook or move through the garden. Shade design should respond to those actual patterns and the site's exposure, with structure and approvals reviewed for the project. Place the intended furniture into the measured plan and review it in use, including chairs pulled away from a table. Consider the view and light inside adjoining rooms. The preferred option should balance those relationships with the relevant technical requirements, giving the household a clear reason for the selected position and structure.

02

Coordinate surfaces and water

Terrace levels, door thresholds, drainage and planting edges belong in the same drawing. Surface selection should account for heat, wet conditions and the intended maintenance routine. Ask the appointed team to review the supporting construction and the junctions between products, not only the visible sample. Identify how the area is cleaned and how damaged components could be addressed. Keep current manufacturer information connected to the selected finish so the care discussion reflects the actual material and exposure.

03

Design the evening scene

Use lighting to support paths, steps, dining and selected planting without making every surface equally bright. Coordinate fittings, cables, controls and maintenance access with the landscape plan. Describe a few useful evening settings in plain language and review them from the house as well as the garden. Keep the technical design with the appointed professionals. Include operation, access and product references in the handover so the intended atmosphere remains understandable to the people using and maintaining the space.

THE STUDIO STORY

Three perspectives.
One considered brief.

Meet three fictional studio characters exploring project management, design and specialist coordination.

Explore the studio story
YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your outdoor living brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry