Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Solenne / Inspiration library

Ideas to start a better conversation.

Explore four visual directions for outdoor living. Use the spaces, details and materials to describe what matters in your own brief.

Original design concepts exploring layouts, materials and details. Use them as references for your own project brief.

Shaded villa terrace with dining, planting and outdoor seating
DESIGN STUDY 01 · CONCEPT

The open-air dining room

Solenne plans outdoor living as an extension of the home. A terrace may need to support breakfast, family time, cooking and evening entertaining, with different requirements for shade, circulation and light at each moment.

Explore the thinking
Outdoor terrace concept with a timber pergola, dining table and integrated kitchen.
DESIGN STUDY 02 · CONCEPT

The planning conversation

Record when and where you want to sit, cook or move through the garden. Shade design should respond to those actual patterns and the site's exposure, with structure and approvals reviewed for the project. Place the intended furniture into the measured plan and review it in use, including chairs pulled away from a table. Consider the view and light inside adjoining rooms. The preferred option should balance those relationships with the relevant technical requirements, giving the household a clear reason for the selected position and structure.

Explore the thinking
Solenne Outdoors architectural detail concept
DESIGN STUDY 03 · CONCEPT

Cooking beneath the pergola

The practical design begins with the site: sun exposure, existing levels, drainage, access and the relationship to doors and neighbouring spaces. Planting, structures, services and furniture should be coordinated before individual features are purchased.

Explore the thinking
Evening courtyard concept with stone paths, planted seating edges and soft shielded lighting.
DESIGN STUDY 04 · CONCEPT

A closer look at materials

Use lighting to support paths, steps, dining and selected planting without making every surface equally bright. Coordinate fittings, cables, controls and maintenance access with the landscape plan. Describe a few useful evening settings in plain language and review them from the house as well as the garden. Keep the technical design with the appointed professionals. Include operation, access and product references in the handover so the intended atmosphere remains understandable to the people using and maintaining the space.

Explore the thinking
FROM REFERENCE TO BRIEF

Tell us what draws you in.

Share the image and describe the particular quality you like: the layout, the light, a material relationship or a place to spend time. Add photographs of your own property so the next discussion can connect the idea to the real setting.

Three questions to take forward

  • Which part of this idea supports the way you want to use the space?
  • What needs to be retained, changed or investigated at your property?
  • What level of care and maintenance fits your routine?
YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your outdoor living brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry