Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
DESIGN STUDY / 02

Cooking beneath the pergola

An original outdoor living concept exploring how material, proportion and practical use can work together.

Cooking beneath the pergola — original design concept
Original design concept · Solenne Outdoors

The brief

Integrated gardens, pools, shade and outdoor entertaining. This study explores a setting where daily use and a clear visual language guide the design together.

The design thinking

Solenne plans outdoor living as a natural extension of the home. Shade, planting, pools and entertaining spaces are considered together, with the site and daily routines leading the design. The concept brings that approach into a spatial idea, using a restrained material palette and clear relationships between the main elements.

From concept to your property

A visual direction is the beginning of a conversation. Translating it into a project requires measured information, a site review, specialist coordination and an agreed specification.

  • Plot levels, drainage and access
  • Shade structures and hardscape
  • Outdoor equipment and service routes
  • Pool, planting and lighting interfaces
Develop a brief like this
THE STUDY IN DETAIL

A closer look at the detail.

Ground levels, drainage, heat exposure and equipment services affect the layout before furniture and finishes are chosen.

Original design concept

Concept: villa terrace and entertaining space

The detail study narrows the wider brief to cooking beneath the pergola. Arrange shade, cooking, dining and planting as connected outdoor rooms that remain easy to maintain.

Design decisions

  • Study shade and daily use before locating the main seating areas.
  • Coordinate service routes and equipment access ahead of hardscape work.
  • Resolve the connections to doors, pools and planting beds together.
PROPOSED PROJECT TIMELINE

From the first brief to handover.

A proposed sequence for this design study. External review periods, site conditions and supplier lead times are confirmed for each commissioned project. Some stages may overlap.

  1. Stage 1

    Discovery & measured brief

    Arrange shade, cooking, dining and planting as connected outdoor rooms that remain easy to maintain.

    Review point · A scope and responsibility record
  2. Stage 2

    Design & coordinated specification

    Study shade and daily use before locating the main seating areas.

    Review point · A reviewed drawing and specification package
  3. Stage 3

    Selections & procurement planning

    Coordinate service routes and equipment access ahead of hardscape work.

    Review point · A selection register and supply responsibilities
  4. Stage 4

    Proposed delivery sequence

    Resolve the connections to doors, pools and planting beds together.

    Review point · Staged inspections and change records
  5. Stage 5

    Review & handover planning

    Review the agreed scope and record outstanding items before completion is accepted.

    Review point · A snagging list, care information and agreed close-out
SPECIFICATION & QUALITY

Details that can be reviewed.

Concept palette

  • Warm exterior timber appearance
  • Pale textured paving
  • Weather-suitable upholstery concept

Proposed quality records

  • A coordinated levels and drainage brief
  • Equipment and specialist installation responsibilities
  • Material care and maintenance-access review

The concept aims for a coordinated and usable space. Performance requirements, cost and completion milestones are agreed for each commissioned project.

Our project standards
YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your outdoor living brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry