Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
OUTDOOR LIVING DUBAI

Life,
beyond the doors.

Shade, planting, pools and entertaining spaces are considered together, with the site and daily routines leading the design.

Shaded villa terrace with dining, planting and outdoor seating
SOLENNE OUTDOORSCONCEPT STUDY
DESIGN WITH INTENTDETAIL WITH PURPOSEDELIVERY WITH CLARITY
THE SOLENNE APPROACH

Outdoor living spaces in Dubai

Solenne plans outdoor living as a natural extension of the home. Shade, planting, pools and entertaining spaces are considered together, with the site and daily routines leading the design.

Meet Solenne
OUR EXPERTISE

Considered from
every angle.

Integrated gardens, pools, shade and outdoor entertaining.

IDEAS TAKING SHAPE

A sense of what’s possible.

Explore projects & concepts
A CLEAR WAY FORWARD

From the first idea
to the last detail.

A considered project needs more than a beautiful finish. It needs a clear brief, coordinated decisions and a defined scope.

Our approach
  1. 01

    Begin with a conversation

    Share the property, your priorities and the way you want the space to work. We identify the right specialist scope and the information needed for the next step.

  2. 02

    Understand the place

    Review dimensions, existing conditions, services and access. Where required, a site survey and specialist review establish what can be taken forward.

  3. 03

    Define every detail

    Agree the design, material selections, responsibilities and itemised proposal. The programme records the decisions and dependencies before work begins.

  4. 04

    Coordinate the work

    Your agreed project contact coordinates the work packages, updates and changes. Important concealed stages and finish details are reviewed before progressing.

Product references for your brief. Final models, availability and supply terms are confirmed in your proposal.

THE JOURNAL

Good decisions start here.

All articles
BEFORE WE BEGIN

A little more clarity.

Answers to the questions we start with.

Ask about your project

THE THINKING BEHIND THE SPACE

Make the outdoor room useful throughout the day.

01

Plan shade around use

Record when and where you want to sit, cook or move through the garden. Shade design should respond to those actual patterns and the site's exposure, with structure and approvals reviewed for the project. Place the intended furniture into the measured plan and review it in use, including chairs pulled away from a table. Consider the view and light inside adjoining rooms. The preferred option should balance those relationships with the relevant technical requirements, giving the household a clear reason for the selected position and structure.

02

Coordinate surfaces and water

Terrace levels, door thresholds, drainage and planting edges belong in the same drawing. Surface selection should account for heat, wet conditions and the intended maintenance routine. Ask the appointed team to review the supporting construction and the junctions between products, not only the visible sample. Identify how the area is cleaned and how damaged components could be addressed. Keep current manufacturer information connected to the selected finish so the care discussion reflects the actual material and exposure.

03

Design the evening scene

Use lighting to support paths, steps, dining and selected planting without making every surface equally bright. Coordinate fittings, cables, controls and maintenance access with the landscape plan. Describe a few useful evening settings in plain language and review them from the house as well as the garden. Keep the technical design with the appointed professionals. Include operation, access and product references in the handover so the intended atmosphere remains understandable to the people using and maintaining the space.

THE STUDIO STORY

Three perspectives.
One considered brief.

Meet three fictional studio characters exploring project management, design and specialist coordination.

Explore the studio story
THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry