An original outdoor living concept exploring how material, proportion and practical use can work together.
Original design concept · Solenne Outdoors
The brief
Integrated gardens, pools, shade and outdoor entertaining. This study explores a setting where daily use and a clear visual language guide the design together.
The design thinking
Solenne plans outdoor living as a natural extension of the home. Shade, planting, pools and entertaining spaces are considered together, with the site and daily routines leading the design. The concept brings that approach into a spatial idea, using a restrained material palette and clear relationships between the main elements.
From concept to your property
A visual direction is the beginning of a conversation. Translating it into a project requires measured information, a site review, specialist coordination and an agreed specification.
Ground levels, drainage, heat exposure and equipment services affect the layout before furniture and finishes are chosen.
Original design concept
Concept: villa terrace and entertaining space
Arrange shade, cooking, dining and planting as connected outdoor rooms that remain easy to maintain.
Design decisions
Study shade and daily use before locating the main seating areas.
Coordinate service routes and equipment access ahead of hardscape work.
Resolve the connections to doors, pools and planting beds together.
PROPOSED PROJECT TIMELINE
From the first brief to handover.
A proposed sequence for this design study. External review periods, site conditions and supplier lead times are confirmed for each commissioned project. Some stages may overlap.
Week 1
Discovery & measured brief
Arrange shade, cooking, dining and planting as connected outdoor rooms that remain easy to maintain.
Review point · A scope and responsibility record
Weeks 2–3
Design & coordinated specification
Study shade and daily use before locating the main seating areas.
Review point · A reviewed drawing and specification package
Weeks 3–5
Selections & procurement planning
Coordinate service routes and equipment access ahead of hardscape work.
Review point · A selection register and supply responsibilities
Weeks 6–9
Proposed delivery sequence
Resolve the connections to doors, pools and planting beds together.
Review point · Staged inspections and change records
Week 10
Review & handover planning
Review the agreed scope and record outstanding items before completion is accepted.
Review point · A snagging list, care information and agreed close-out
SPECIFICATION & QUALITY
Details that can be reviewed.
Concept palette
Warm exterior timber appearance
Pale textured paving
Weather-suitable upholstery concept
Proposed quality records
A coordinated levels and drainage brief
Equipment and specialist installation responsibilities
Material care and maintenance-access review
The concept aims for a coordinated and usable space. Performance requirements, cost and completion milestones are agreed for each commissioned project.